Logistic Center V-Zug

 

SCHEMI-BIPV-3 trasp

This is the logistic center of V-Zug in Zug, Switzerland. It is conceived to achieve high efficiency thanks to a compact shape and a double skin façade used to maintain low temperature fluctuations in winter and summer. A PV plant is integrated in south façade, with laminated insulating safety glass module, that reflect the surrounding landscape, contributing to form an interesting and important image of the building.

 

vzug1   vzug3 Source: ErtexSolar

 

Project Logistic Center V-Zug  vzug2
Location Zugo (CH)
Latitude 47° 10'
Completion year 2009
Architect Betrix & Consolascio Architekten AG
Typology Industrial
Category New
Surrounding Industrial
Technology Multicrystalline 
Power installed 19.25 kWp (Façade);252 kWp (Roof)
Orientation East/West
PV Module

VSG 1000x4500mm ErtexSolar (Façade)

Dimensions 1800 m2 (Roof)
Transparency
Opaque; Semitransparent