This intervention regards the realization of a PV system on the existing office building of Buhler Electricitè company in Monthey, canton Valais (CH). The system produces 96 MWh/y total, allowing the total energy autonomy of its site.
On the original building, labeled Minergie in 2003, a perfectly integrated solar façade is installed on a part of the south side replacing the final layer of the wall, besides to a PV plant placed on the flat roof through an overlapped system.
Source: Bühler Electricité
| Project | Bühler Electricité | |
| Location | Monthey, Kanton Valais (CH) | |
| Latitude | 46° 51' | |
|
Completion year |
2008-2011 | |
| Architect | Kurmann & Cretton SA | |
| Typology | Administration | |
| Category | Other | |
| Surrounding | Urban | |
| Technology | Monocrystalline | |
| Power installed | - | |
| Orientation | South |
|
| PV Module |
- |
|
| Dimensions | - | |
| Transparency |
Opaque |